When using a Huaquan generator for the first time, it is necessary to prepare in advance to reduce the failure rate. So what should be done before the initial start-up of the Huaquan generator? Please follow Huaquan Electric to read down.
Before starting the Huaquan generator, it is necessary to go to the "three checks and two verifications":
Three inspections ":
1. Check whether the installation of the unit is in place, whether the protective facilities are complete, and whether the operating environment meets the requirements. 2. Check if the connections of the unit's wiring, pipelines, etc. are correct and secure. 3. Check if there is sufficient fuel, oil, coolant, etc.
Two checks ":
1. Check if the switch on the generator set is in the correct position.
2. Check whether the signal lights indicate correctly, etc.
When starting the generator set for the first time, in addition to following the above principles, it is also necessary to master certain professional knowledge, which can help us better use the unit. If you want to learn more about Huaquan generators, please feel free to contact us.
Huaquan Generator More Information:http://www.goufdj.com/